New Generator at Wastewater Treatment Plant

wastewaterBig Sandy Wastewater started up the new generator at the wastewater treatment plant. This is an improvement made possible through a grant from State of Tennessee Economic Community Development.

Quinn Construction installed the generator and Big Sandy employees, Mike Rogers, Daniel Tidwell and Steve Pierpoint are pictured along with H & D Engineer owner, Alton Hethcoat and project engineer, Jon Allen.